IrvingReference gallery
Oblique aerial view of a mixed-use brick building with a stepped parapet, roofed in a dark-grey low-slope membrane, with neighbouring roofs and mature trees around it.

Modified bitumen · Irving

Low-slope membrane on an Irving mixed-use building

A stepped-parapet brick building with a roof drain and a service lane — a working commercial roof rather than a showpiece.

System Modified bitumenProperty CommercialViews 5

The five passes

The same five views, every time.

A roof assessed from one angle is a roof assessed once. These are the passes every Jacob assessment makes, in this order, so that coverage does not depend on how the day is going.

Oblique aerial view of a mixed-use brick building with a stepped parapet, roofed in a dark-grey low-slope membrane, with neighbouring roofs and mature trees around it.
Pass 01 of 5

Aerial, oblique

The pass that shows how the roof sits on the building — planes, hips, valleys, and how it meets everything around it.

Overhead view looking straight down on a mixed-use brick building with a stepped parapet, showing the full run of a dark-grey low-slope membrane and how the planes drain.
Pass 02 of 5

Aerial, plan

Straight down. This is the view that makes drainage legible and stops a plane being missed because it was awkward to reach.

A mixed-use brick building with a stepped parapet seen from the street, the a dark-grey low-slope membrane visible above the elevation.
Pass 03 of 5

From the street

What the property actually looks like to a person standing in front of it — the only view most quotes are based on.

Close view of a roof drain set into the membrane field, with the surrounding sump and the clamping ring visible.
Pass 04 of 5

System detail

Close enough to read the assembly: courses, seams, terminations, penetrations. Findings are photographed at this range with something for scale.

On this roof: a roof drain set into the membrane field, with the surrounding sump and the clamping ring visible.

A mixed-use brick building with a stepped parapet part-way through a modified bitumen installation, with finished and unfinished areas both visible.
Pass 05 of 5

Work in progress

Mid-installation, where the parts that end up hidden are still visible. A roof is easiest to judge before it is finished.

What this roof raises

Three things a roof like this makes you check.

Every property puts its own questions in front of an assessor. These are the ones this system on this kind of house raises — and the same ones we would bring to yours.

01

A stepped parapet means the roof is really several roofs at different heights. Water that leaves one and lands on another concentrates in a way a single-level roof never does.

02

Internal drains are the whole system on a building like this. A blocked drain does not leak slowly — it loads the deck, and that is a structural question, not a covering one.

03

Commercial re-roofing usually has to be staged around a tenant who is still trading. That sequencing belongs in the scope from the beginning, because it changes both the programme and the price.

How modified bitumen behaves Roofing in Irving

Book an assessment

Tell us where, and what you noticed.

Four steps, three things to type. We confirm the address is in our area, then come and look at the whole roof — not just the bit you pointed at.

Step 1 of 4 · Situation

What is happening at the property?

You keep whatever we document, whether or not you hire us.