Substrate decides the system
Stucco, fibre cement, wood trim, masonry and metal each take a different primer and a different coating. One product across all of them is a shortcut with a visible end date.
(214) 807-0414Request an assessmentExterior painting
A coating is the last thing that happens to a wall and the first thing that shows when something underneath was skipped. Peeling, chalking and early failure are nearly always a preparation or a moisture problem, not a product problem — which is why the specification here is mostly about what happens before the first coat.
Request an assessment
What this covers
Washing, scraping, sanding, spot-priming and caulking are where the service life is decided. The coats on top are the visible part, not the important part.
Rotted fascia, failed caulk, open stucco cracks and loose trim are repaired and cured before coating. Painting over any of them buys months, not years.
North Texas sun destroys a south or west elevation faster than the other two. Uneven fading across a house is normal and it changes how a repaint is planned.
What to know

Stucco, fibre cement, wood trim, masonry and metal each take a different primer and a different coating. One product across all of them is a shortcut with a visible end date.
Dark colours on a west-facing wall run hotter and move more, which shortens the life of the coating and the caulk under it. Worth knowing before the colour is chosen.
Products, sheens, colours, batch and where each was used — so a touch-up in three years is a touch-up and not a repaint.
Choose a starting point
A short, non-diagnostic guide for working out what kind of assessment conversation to prepare for.
Decision support
Four situations, and the sensible next move for each. It does not diagnose a roof, decide insurance coverage, or stand in for somebody looking at the property.
Questions
It depends far more on preparation, elevation and substrate than on the product. Ask any contractor what their preparation involves before you compare their warranties.
No. Caulk fails by losing adhesion or splitting, and paint over the top of it bridges the gap for a season and then tears along the same line. Worse, it makes the failure harder to see, so water keeps entering at a joint that now looks finished. Failed sealant is cut out and replaced before anything is coated.
Usually it should. Anything above drains onto anything below, so roof and edge work comes first where both are in scope.
No, and in this climate the instinct to do so is often the wrong one. South and west walls fail years ahead of north and east ones, so painting all four together means coating two that did not need it. The real constraint is matching: a repainted elevation against three that have been fading will read as new for a while. Whether that is acceptable is a judgement about the house, and it should be made deliberately rather than by default.
Assessment request
Short, routing-only questions. Nothing here asks you to diagnose the roof yourself.